Technical Requirements (phase 1)
Technical Specification – Design Phases of the Control System This is the first article in this series where we try to describe the different design phases of a control system. In PLC-based systems the design engineer must analyze all the technical requirements and make the design that meets the specifications with the lowest possible cost. …