Day: August 11, 2017

HMI / SCADA (phase 5)

Phase 5: Selection of HMI In this article we discuss the selection of the HMI / SCADA (index of design phases). 5-Selection of HMI or SCADA In medium or large systems, normally the operator interface is defined in the technical specification. If it is a PLC system we will talk about a SCADA, if it …

HMI / SCADA (phase 5) Read More »

CPU and Architecture (phase 4)

Phase 4: CPU selection and Control System Architecture In this article we discuss how to select the CPU and describe the main options for the Control System Architecture (index of design phases). 4-CPU selection and design of Control System Architecture The selection of CPU and PLC / PAC model depends directly on several parameters. Some …

CPU and Architecture (phase 4) Read More »

Functional Distribution (phase 3)

Phase 3: Grouping and segmentation of I/Os and Racks (functional distribution) In this article we discuss the importance of the functional distribution of I/Os, especially in medium size and large control systems (index of design phases). 3-Grouping and segmentation of signals and racks – Functional distribution The way we distribute I/O signals, modules and racks …

Functional Distribution (phase 3) Read More »