Isolators and Terminals (phase 7)

Phase 7: Isolators and Terminal Blocks In this article we discuss the options we have for isolators, converters, barriers, terminal blocks and other components (index of design phases).     7-Isolators, field terminals and prefabricated cables   Converters, Isolators and Barriers They are used to convert signal ranges, to electrically […]

Posted by

HMI / SCADA (phase 5)

Phase 5: Selection of HMI In this article we discuss the selection of the HMI / SCADA (index of design phases).       5-Selection of HMI or SCADA In medium or large systems, normally the operator interface is defined in the technical specification. If it is a PLC system […]

Posted by